Real

elecsa logo

MCS Logo

Elecsa PV Installer

CSCS scheme

 

 

Colin near Derby

2.4Kwp Canadian Solar Array using SMA 2500HF-30 inverter, Walton, Somerset

Calculation of the performance of the array
Under the terms of the Micro Generation Standard we use the formulae in the Governments Standard Assessment Procedure (SAP) 2009 draft, this is designed to provide a ‘conservative’ estimate of pv output. The procedure is as follows:

1) Establish the installed peak power of the PV array (kWp).
2) The electricity produced by the PV array:

kWh/year = 0.8 x kWp x´ S ´ x ZPV

S is the annual solar radiation from Table H2
ZPV is the overshading factor from Table H4.